lemon-mirror:
Home >> Scion >> 2006 >> xA Automatic >> Repair and Diagnosis >> Electrical >> Gauges >> Meter >> Combination Meter >> Installation

Combination Meter: Installation

  1. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect the connectors and install the combination meter with the 3 screws.
      Fig 1: Connecting Connectors And Installing Combination Meter With 3 Screws
      G04158938Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL 
    1. Attach the 6 claws to install the cluster finish panel.
    2. Install the 2 clips.
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  4. PERFORM INITIALIZATION 
    1. Perform initialization (see INITIALIZATION ).
      NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
  5. CHECK SRS WARNING LIGHT 
    1. Check the SRS warning light (see DIAGNOSIS SYSTEM ).
      Fig 2: Checking SRS Warning Light
      G04158939Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002