lemon-mirror:
Home >> Subaru >> 2005 >> Baja Base, Automatic >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Automatic Transmission >> Reduction Driven Gear >> Installation >> MPT Model

MPT Model

  1. Set the select lever to "P" range.
  2. Using a plastic hammer, install reduction driven gear assembly and new washer, and tighten new drive pinion lock nut.

    Tightening torque: 

    100 N.m (10.2 kgf-m, 73.8 ft-lb) 

    Fig 1: Installing Drive Pinion Lock Nut - MPT Model
    G03750587Courtesy of SUBARU OF AMERICA, INC.
  3. After tightening, stake the lock nut securely.
  4. Combine the transmission case with the extension case, and install rear vehicle speed sensor. < Ref. to , INSTALLATION . >
  5. Install the transmission assembly to vehicle. < Ref. to , INSTALLATION . >