Control Valve Body: Installation
- Check the control valve body for dust and other foreign matter.
- Temporarily assembly the control valve body to transmission then install the oil cooler pipe.
Tightening torque:
8 N.m (0.8 kgf-m, 5.8 ft-lb)
- Tighten the bolts equally.
Tightening torque:
8 N.m (0.8 kgf-m, 5.8 ft-lb)
- Connect the control valve connector.
- Attach the magnet at the specified position of the oil pan.
- Apply proper amount of liquid gasket to the entire oil pan mating surface.
Liquid gasket:
Three bond 1217B (Part No. K0877YA020)
- Fill the 3 holes aside from the bolt holes in the transmission case, with liquid gasket.
Liquid gasket:
Three bond 1217B (Part No. K0877YA020)
- Install the oil pan by equally tightening the bolts.
Tightening torque:
5 N.m (0.5 kgf-m, 3.6 ft-lb)
- Fill ATF from the oil charger pipe.
Recommended fluid:
SUBARU ATF
Substitute fluid:
IDEMITSU: APOLLOIL ATF HP
Castrol: Transmax J
Pennzoil Quaker State: Pennzoil ATF-J
Capacity:
Fill with the same amount of fluid that was drained from the drain plug hole.
- Bleed the air of control valve body. <Ref. to AIR BLEEDING OF CONTROL VALVE . >
- Check the ATF level. <Ref. to AUTOMATIC TRANSMISSION FLUID . >
- Execute the learning control promotion. <Ref. to FACILITATION OF LEARNING CONTROL OPERATION, Subaru Select Monitor. >