Starting/Charging Systems (H4SO): Generator: Assembly
Assemble in the reverse order of disassembly.
- Pull-out of the brush
Before assembling, press the brush down into the brush holder, then fix the brush in that position by inserting a [1 mm (0.08 in) dia., 40 to 50 mm (1.6 to 2.0 in) long] wire through the hole as shown in the figure.
CAUTION: After re-assembling, remove the wire. - Install the ball bearings.
- Set the ball bearings in the front cover, then securely install an appropriate tool (such as a socket wrench of proper size) to the bearing outer race.
- Using a press to press the ball bearings into the specified location.
- Install the bearing retainer.
- Use a press to install the bearings (rear side) to the rotor shaft.
- Heat the bearing box in rear cover [50 to 60°C (122 to 140°F)], and then press the rear bearing into rear cover.CAUTION: Do not apply grease to the rear bearings. If there is any oil on the bearing box, remove it completely.
- After re-assembling, manually turn the pulley to check that the rotor rotates smoothly.