lemon-mirror:
Home >> Subaru >> 2009 >> Forester XT >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Fuel Injection System (H4DOTC) >> Tumble Generator Valve Assembly >> Installation

Tumble Generator Valve Assembly: Installation

Install in the reverse order of removal.

NOTE: Use a new gasket.

Tightening torque: 

8.3 N.m (0.8 kgf-m, 6.1 ft-lb) 

Fig 1: Locating Intake Manifold Bolts
G05340123Courtesy of SUBARU OF AMERICA, INC.