Control Valve Body: Installation
- Check the control valve body for dust and other foreign matter.
- Temporarily tighten the control valve body to the transmission.
- Install the oil cooler pipe.
Tightening torque:
8 N.m (0.8 kgf-m, 5.9 ft-lb)
- Tighten the bolts equally.
Tightening torque:
8 N.m (0.8 kgf-m, 5.9 ft-lb)
- Connect the control valve connector.
- Attach the magnet at the specified position of the oil pan.
- Apply proper amount of liquid gasket to the entire oil pan mating surface.
Liquid gasket:
THREE BOND 1217B (Part No. K0877YA020) or equivalent
- Fill the 3 holes aside from the bolt holes in the transmission case, with liquid gasket.
Liquid gasket:
THREE BOND 1217B (Part No. K0877YA020) or equivalent
- Install the oil pan by equally tightening the bolts.
Tightening torque:
5 N.m (0.5 kgf-m, 3.7 ft-lb)
- Fill ATF from the oil charger pipe.
Recommended fluid:
Refer to HYDRAULIC CONTROL AND LUBRICATION , SPECIFICATION, General Description.
Capacity:
Fill with the same amount of ATF as drained .
- Bleed the air of control valve. Refer to AIR BLEEDING OF CONTROL VALVE .
- Check the ATF level.
Refer to AUTOMATIC TRANSMISSION FLUID .
- Execute the learning control promotion. Refer to PROCEDURE , Learning Control.