lemon-mirror:
Home >> Subaru >> 2009 >> Forester XT >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Automatic Transmission 4AT >> Front Vehicle Speed Sensor >> Installation

Front Vehicle Speed Sensor: Installation

  1. Pass the transmission harness assembly through the hole of the transmission case.
    Fig 1: Identifying Transmission Harness Assembly
    G05002532Courtesy of SUBARU OF AMERICA, INC.
  2. Connect the control valve connector and transmission ground.

    Tightening torque: 

    8 N.m (0.8 kgf-m, 5.9 ft-lb) 

    Fig 2: Identifying Control Valve Connector And Transmission Ground
    G05956002Courtesy of SUBARU OF AMERICA, INC.
  3. Apply proper amount of liquid gasket to the entire oil pan mating surface.

    Liquid gasket: 

    THREE BOND 1217B (Part No. K0877YA020) or equivalent 

    Fig 3: Applying Proper Amount Of Liquid Gasket To Entire Oil Pan Mating Surface
    G05002534Courtesy of SUBARU OF AMERICA, INC.
  4. Fill the 3 locations of the transmission case excluding the bolt holes with an ample amount of liquid gasket.

    Liquid gasket: 

    THREE BOND 1217B (Part No. K0877YA020) or equivalent 

    Fig 4: Locating Transmission Case Excluding Bolt Holes
    G05956004Courtesy of SUBARU OF AMERICA, INC.
  5. Install the oil pan by equally tightening the bolts.

    Tightening torque: 

    5 N.m (0.5 kgf-m, 3.7 ft-lb) 

  6. Install the front vehicle speed sensor and torque converter turbine speed sensor.

    Tightening torque: 

    7 N.m (0.7 kgf-m, 5.2 ft-lb) 

  7. Connect the connector to the rear vehicle speed sensor.
  8. Install the ATF inlet and outlet pipes.
    NOTE: Use a new copper washer.

    Tightening torque: 

    T1: 25 N.m (2.5 kgf-m, 18.4 ft-lb) 

    T2: 40 N.m (4.1 kgf-m, 29.5 ft-lb) 

    T3: 45 N.m (4.6 kgf-m, 33.2 ft-lb) 

    Fig 5: Identifying ATF Inlet And Outlet Pipes
    G05956005Courtesy of SUBARU OF AMERICA, INC.
  9. Install the transmission rear crossmember bolt.

    Tightening torque: 

    70 N.m (7.1 kgf-m, 51.6 ft-lb) 

  10. Install the propeller shaft. Refer to INSTALLATION , Propeller Shaft.
  11. Install the heat shield cover.
    Fig 6: Identifying Heat Shield Cover
    G05661183Courtesy of SUBARU OF AMERICA, INC.
  12. Install the front, center and rear exhaust pipes, and the muffler. (Non-turbo model)

    Refer to INSTALLATION , Front Exhaust Pipe. Refer to INSTALLATION , Rear Exhaust Pipe. Refer to INSTALLATION , Muffler.

  13. Install the center, rear exhaust pipes and the muffler. (Turbo model)

    Refer to INSTALLATION , Center Exhaust Pipe. Refer to INSTALLATION , Rear Exhaust Pipe. Refer to INSTALLATION , Muffler.

  14. Lower the vehicle.
  15. Install the transmission harness connector to the stay.
  16. Install the pitching stopper. Refer to INSTALLATION , Transmission Mounting System.
  17. Install the air intake chamber. (Non-turbo model)

    Refer to INSTALLATION , Air Intake Chamber.

  18. Install the intercooler. (Turbo model)

    Refer to INSTALLATION , Intercooler.

  19. Fill with the same amount of ATF as drained.
  20. Bleed the air of control valve.

    Refer to AIR BLEEDING OF CONTROL VALVE .

  21. Inspect the level of ATF. Refer to AUTOMATIC TRANSMISSION FLUID .
  22. Execute the learning control promotion. Refer to PROCEDURE , Learning Control.