Front Lateral Link: Installation
CAUTION:
- Be sure to use a new self-locking nut.
- Always tighten bushings with wheels in full contact with the ground and the vehicle at curb weight.
- Install in the reverse order of removal.
Tightening torque:
Front lateral link to Sub frame
120 N.m (12.2 kgf-m, 89 ft-lb)
Front lateral link to Rear axle housing.
27 N.m (2.8 kgf-m, 20 ft-lb)
- Inspect the wheel alignment and adjust if necessary.