LH Side
- Install the ignition coil (LH side) and connect the connector (A).CAUTION: Degrease the mounting bolts, rocker cover installation portion and ignition coil installation hole.
Tightening torque:
8.5 N.m (0.9 kgf-m, 6.3 ft-lb)
- Install the fuel pipe protector LH No. 1. Ref. to FUEL INJECTION (FUEL SYSTEMS) (H4DO)>FUEL PIPE PROTECTOR>INSTALLATION>FUEL PIPE PROTECTOR LH>FUEL PIPE PROTECTOR LH NO. 1 .
- Install the fuel protector (B) and secure the fuel delivery tube clamp with claw (A) together with each tube.
Tightening torque:
8 N.m (0.8 kgf-m, 5.9 ft-lb)
- Install the strut tower bar LH. Ref. to FRONT SUSPENSION>STRUT TOWER BAR>INSTALLATION .
- Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .