RH Side
- Install the ignition coil (RH side) and connect the connector (A).CAUTION: Degrease the mounting bolts, rocker cover installation portion and ignition coil installation hole.
Tightening torque:
8.5 N.m (0.9 kgf-m, 6.3 ft-lb)
- Install the ECM. Ref. to FUEL INJECTION (FUEL SYSTEMS) (H4DO)>ENGINE CONTROL MODULE (ECM)>INSTALLATION .
- Install the strut tower bar RH. Ref. to FRONT SUSPENSION>STRUT TOWER BAR>INSTALLATION .
- Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .