Trailing Link: Installation
CAUTION:
- For parts which are not reusable, always use new parts.
- Always tighten the bushing in the state where the vehicle is at curb weight and the wheels are in full contact with the ground.
- Install the trailing link assembly rear.
Tightening torque:
On flange bolt side: 100 N.m (10.2 kgf-m, 73.8 ft-lb)
- Install the adapter cord EPB.
Tightening torque:
18 N.m (1.8 kgf-m, 13.3 ft-lb)
- Install the rear wheels and lower the vehicle.
Tightening torque:
120 N.m (12.2 kgf-m, 88.5 ft-lb)
- Inspect the wheel alignment and adjust if necessary.
- Inspection: Ref. to FRONT SUSPENSION>WHEEL ALIGNMENT>INSPECTION .
- Adjustment: Ref. to FRONT SUSPENSION>WHEEL ALIGNMENT>ADJUSTMENT .
- Perform "VDC sensor midpoint setting mode". Ref. to VEHICLE DYNAMICS CONTROL (VDC)>VDC CONTROL MODULE AND HYDRAULIC CONTROL UNIT (VDCCM & H/U)>ADJUSTMENT>VDC SENSOR MIDPOINT SETTING MODE .
- Perform the lane keep assist learning value clear. (Models with EyeSight) Ref. to EYESIGHT (DIAGNOSTICS)>WORK SUPPORT>OPERATION .