Engine Starting System & Charging System (2.5L): Generator: Installation
- Temporarily install the generator.
- Tighten the bolts in the numerical order as shown in the figure.
Tightening torque:
25 N.m (2.5 kgf-m, 18.4 ft-lb)
- Connect the connector and terminal B.CAUTION: As residual anti-rust grease or dirt on the threads (bolts and nuts), terminals and seating surfaces may cause overtorque, clean and degrease them.
Tightening torque:
15.5 N.m (1.6 kgf-m, 11.4 ft-lb)
- After connecting the terminal B, apply a thin coat of anti-rust grease to the terminal section.CAUTION: This procedure is required to prevent rust and suppress sulfation.
Preparation items:
Grease: Viscotech R174 or equivalent Ref. to RECOMMENDED MATERIALS>GREASE>STARTING/CHARGING SYSTEM
(A) Anti-rust grease application area - Install the V-belts. Ref. to MECHANICAL (H4DO)>V-BELT>INSTALLATION>V-BELT .
- Install the air intake duct. Ref. to INTAKE (INDUCTION) (H4DO)>AIR INTAKE DUCT>INSTALLATION .
- Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .