lemon-mirror:
Home >> Suzuki >> 2005 >> Verona EX >> Repair and Diagnosis >> Transmission >> Automatic Transmission >> Repair Instructions >> Shift Control Cable Installation

Shift Control Cable Installation

  1. Install the shift control cable into the fire wall of the vehicle.
  2. Install the shift control cable onto the transaxle mount.
    Fig 1: Removing Shift Control Assembly
    G04095419Courtesy of SUZUKI OF AMERICA CORP.
  3. Install the shift control cable onto the shift control assembly.
  4. Tighten the nut on the cable bracket.
  5. Install the shift control cable adjuster pinch nut.

    Tighten 

    Tighten the nut to 8 N.m (71 lb-in).

    Fig 2: Installing Shift Control Assembly
    G04095420Courtesy of SUZUKI OF AMERICA CORP.
  6. Install the clip to the shift control cable at the transaxle mount connection.
  7. Install the clip to the select lever connection on the transaxle case.
  8. Adjust the shift control cable. Refer to "SHIFT CONTROL CABLE ADJUSTMENT ".
  9. Install the air filter housing assembly and bolts.

    Tighten 

    Tighten the bolts to 10 N.m (89 lb-in).

  10. Connect the negative battery cable.
    Fig 3: Installing Shift Control Cable Onto Bracket
    G04095421Courtesy of SUZUKI OF AMERICA CORP.