lemon-mirror:
Home >> Toyota >> 1992 >> Land Cruiser >> Repair and Diagnosis >> Engine Performance >> Sensor Range Charts >> Engine Controls - Sensor Operating Range Charts >> Introduction >> Cold Start Injector Time Switch

Cold Start Injector Time Switch

COLD START INJECTOR TIME SWITCH RESISTANCE

Application & Terminals (1) Temperature: °F (°C) Ohms Reading
STA & STJ Less Than 59 (15) 30-50
" Greater Than 86 (30) 70-90
STA & Ground N/A 30-90
(1) For terminal identification and testing, see I - SYS/COMP TESTS article in the ENGINE PERFORMANCE Section.