Power Outlet: Clock: Installation
- INSTALL CLOCK ASSEMBLY
- INSTALL ACCESSORY METER ASSEMBLY
- INSTALL COMBINATION METER ASSEMBLY
- INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
- INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY CENTER
- INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
- INSTALL INSTRUMENT PANEL FINISH PLATE (w/o Smart Key System)
- INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH NO.2
- INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH NO.1
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Some systems need initialization when disconnecting the cable from the negative battery terminal (See
INITIALIZATION
).