Throttle Body: Installation
- INSTALL THROTTLE BODY ASSEMBLY
- Install a new throttle body gasket to the intake air surge tank.
- Install the throttle body assembly with the 4 bolts.
Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf)
- Connect the fuel vapor feed hose (A).
- Connect the No. 3 water by-pass hose (B).
- Connect the No. 2 water by-pass hose (C).
- Connect the throttle motor connector (D).
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- ADD ENGINE COOLANT (for Engine) (See REPLACEMENT )
- INSPECT FOR COOLANT LEAK (for Engine) (See ON-VEHICLE INSPECTION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See INITIALIZATION ).
- INSTALL NO. 2 ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY (See INSTALLATION )
- INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY (See INSTALLATION )
- INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL HOOD TO COWL TOP SEAL (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH (See INSTALLATION )