Shift Lever: Installation
- INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
- Install the floor shift with the 4 bolts. Tighten the bolts in the order shown in the illustration (Fig 1).
Torque: 14 N*m (143 kgf*cm, 10 ft.*lbf)
- Connect the 2 connectors.
- Install the floor shift with the 4 bolts. Tighten the bolts in the order shown in the illustration (Fig 1).
- CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- Turn the control shaft lever RH of the park/neutral position switch counterclockwise until it stops, and then turn it clockwise 2 notches to set it to the N position.
- Move the shift lever to N.
- Temporarily install the floor shift gear shifting rod with the nut.
- Tighten the nut while lightly pushing the lever rearward.
Torque: 13 N*m (130 kgf*cm, 9 ft.*lbf)
- INSTALL REAR CONSOLE BOX SUB-ASSEMBLY (w/ o Cool Box) (See INSTALLATION )
- INSTALL COOLING BOX ASSEMBLY (w/ Cool Box) (See INSTALLATION )
- INSTALL CONSOLE REAR END PANEL SUBASSEMBLY (See INSTALLATION )
- INSTALL NO. 1 COOLER COVER (w/ Cool Box) (See INSTALLATION )
- INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (See INSTALLATION )
- INSTALL CONSOLE CUP HOLDER BOX SUBASSEMBLY (See INSTALLATION )
- INSTALL REAR UPPER CONSOLE PANEL SUBASSEMBLY (See INSTALLATION )
- INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (See INSTALLATION )
- INSTALL LOWER INSTRUMENT PANEL PAD SUBASSEMBLY RH (See INSTALLATION )
- INSTALL NO. 1 INSTRUMENT PANEL FINISH CUSHION (See INSTALLATION )
- INSTALL LOWER INSTRUMENT PANEL PAD SUBASSEMBLY LH (See INSTALLATION )
- INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION (See INSTALLATION )
- CHARGE REFRIGERANT (w/ Cool Box) (See REPLACEMENT )
- CHECK FOR REFRIGERANT GAS LEAK (w/ Cool Box) (See REPLACEMENT )
- INSPECT SHIFT LEVER POSITION (See ON-VEHICLE INSPECTION )