lemon-mirror:
Home >> Toyota >> 2008 >> Land Cruiser >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Automatic Transmission >> Shift Lever >> Installation

Shift Lever: Installation

  1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY 
    1. Install the floor shift with the 4 bolts. Tighten the bolts in the order shown in the illustration (Fig 1).

      Torque: 14 N*m (143 kgf*cm, 10 ft.*lbf) 

    2. Connect the 2 connectors.
      Fig 1: Identifying Floor Shift Bolts Tightening Sequence
      G05629199Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY 
    1. Turn the control shaft lever RH of the park/neutral position switch counterclockwise until it stops, and then turn it clockwise 2 notches to set it to the N position.
    2. Move the shift lever to N.
      Fig 2: Turning Control Shaft Lever RH Of Park/Neutral Position Switch
      G05629200Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Temporarily install the floor shift gear shifting rod with the nut.
    4. Tighten the nut while lightly pushing the lever rearward.

      Torque: 13 N*m (130 kgf*cm, 9 ft.*lbf) 

  3. INSTALL REAR CONSOLE BOX SUB-ASSEMBLY (w/ o Cool Box)  (See INSTALLATION )
  4. INSTALL COOLING BOX ASSEMBLY (w/ Cool Box)  (See INSTALLATION )
  5. INSTALL CONSOLE REAR END PANEL SUBASSEMBLY  (See INSTALLATION )
  6. INSTALL NO. 1 COOLER COVER (w/ Cool Box)  (See INSTALLATION )
  7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY  (See INSTALLATION )
    Fig 3: Pushing Lever
    G05629201Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  8. INSTALL CONSOLE CUP HOLDER BOX SUBASSEMBLY  (See INSTALLATION )
  9. INSTALL REAR UPPER CONSOLE PANEL SUBASSEMBLY  (See INSTALLATION )
  10. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY  (See INSTALLATION )
  11. INSTALL LOWER INSTRUMENT PANEL PAD SUBASSEMBLY RH  (See INSTALLATION )
  12. INSTALL NO. 1 INSTRUMENT PANEL FINISH CUSHION  (See INSTALLATION )
  13. INSTALL LOWER INSTRUMENT PANEL PAD SUBASSEMBLY LH  (See INSTALLATION )
  14. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION  (See INSTALLATION )
  15. CHARGE REFRIGERANT (w/ Cool Box)  (See REPLACEMENT )
  16. CHECK FOR REFRIGERANT GAS LEAK (w/ Cool Box)  (See REPLACEMENT )
  17. INSPECT SHIFT LEVER POSITION  (See ON-VEHICLE INSPECTION  )